Nexus Global
  • apm solutions
    • Leadership
    • Strategy Management
    • Work Management
    • Data Management
    • Investigation Management
  • apm software
    • Business Optimizer
    • Data Optimizer
    • Investigation Optimizer
    • Planning Optimizer
    • Strategy Optimizer
  • apm training
  • Home
  • resources
    • blog
    • news & events
  • our company
    • about us
    • careers
    • clients
    • leadership team
    • locations
  • contact
    • Contact Us
    • Software Support

Search form

Posted by Doug Robey | CMRP, CRL ● Aug 11, 2021

How to Cut Asset Downtime by 40% with CDM/PMO Strategy Reboot

Apple Podcasts Spotify Stitcher Google
×

Listen to this podcast on

Apple Spotify Google Stitcher iHeart Radio TuneIn Overcast Pocket Cast Castro Castbox Podchaser Podcast Addict Deezer Listen Notes RSS Feed

Spotify Apple Podcasts Stitcher Google
×

Listen to this podcast on

Apple Spotify Google Stitcher iHeart Radio TuneIn Overcast Pocket Cast Castro Castbox Podchaser Podcast Addict Deezer Listen Notes RSS Feed

Download the Case Study

 

Facing significant equipment downtime on a mission-critical asset, a leading polymer currency printing company engaged Nexus Global for asset strategy support. To generate the greatest benefits for the client, Nexus Global would recommend a cost-effective PM program based on
known failure modes, consequences, and the likelihood of each failure. The new maintenance strategy would also address challenges involving; equipment, people, process, leadership, and continuous improvement.

The overall strategy would need to balance cost, risk, equipment availability, and performance criteria. To achieve the goal, Nexus Global would develop a new PM Program by using a Consequence Driven Maintenance (CDM) and PM Optimization (PMO) approach to maintenance optimization to identify expected and unacceptable failures and highlight improvement opportunities.

Download the case study to see how we developed and implemented a new maintenance strategy with rapid improvements in equipment downtime, maintenance costs, and inefficiencies. 

Download the Case Study
 
 

Topics: Strategy Management, Case Study, Manufacturing & Life Sciences

  • Share
Doug Robey | CMRP, CRL

Posted by
Doug Robey | CMRP, CRL
President, Nexus Global | As an innovative performance improvement and global business leader, Doug has led a diverse array of clients to design and implement successful initiatives around APM and CAPEX/OPEX. With 25+ years of craft skills and Maintenance & Reliability experience, Doug has promoted positive change within numerous asset-intensive industries; including metals, pharmaceutical, food and beverage, energy, oil and gas, and other manufacturing.

  • Meet the New Investigation Optimizer | September 2020
  • Investigation Optimzier
Never Miss a New Post
 
Topics
 
  • Blog Home
  • News
  • Videos
  • Articles
  • Case Studies
  • White Papers
  • Industry
    • Metals & Mining
    • Power Generation
    • Manufacturing & Life Sciences
    • Energy & Utilities
    • Transportation
  • Topics
    • Leadership
    • Strategy Management
    • Work Management
    • Data Management
    • Investigation Management
Comments
 
Related Posts
 
The 3 Most Popular RCA Tools
DMAIC RCA: A Proven Approach to Reliability
Nexus Global Business Solutions, Inc. and Technology...
Asset Performance Management | More Than Just Implementing...
Maintenance Planner Training... It’s Not Just for Planners
Triggers of a Root Cause Analysis
  • apm solutions
  • news & events
  • blog
  • our company
  • contact

© 2019 Nexus Global. All rights reserved.  |  Privacy Policy

OUR LOCATIONS|view

Location map