Nexus Global was engaged by the Oil & Gas client to conduct an on-site strategy review of the Planned Maintenance activities for the client’s mainline units. The client recognized that the existing PM strategy was in need of review and were looking for a robust and cost effective method of improving it’s existing strategy.
The main requirement of the review was to maximize the equipment uptime and minimize the maintenance costs for the mainline units without negatively impacting the reliability or safety of the equipment. There were 33 identical mainline units, so the new strategy and any maintenance cost reductions would be applied to all.
Download the case study and read more about: Oil & Gas Company Reduced Maintenance Labor Costs on Mainline Units - Strategy Management.