title: Increased Plant Availability and Reduced PM Activities by 30%
description: "Case Study: Using PMO and Strategy Optimizer to increase asset availability/reliability and avoid closing the manufacturing site of a major pharma company."
---

[Knowledge Center](https://blog.nexusglobal.com)

# [Increased Plant Availability and Reduced PM Activities by 30%](https://blog.nexusglobal.com/increased-plant-availability-and-reduced-pm-activities-by-30)

 Written by [Doug Robey | CMRP, CRL](https://blog.nexusglobal.com/author/doug-robey-cmrp-crl) | Aug 23, 2021

[Download the Case Study](https://blog.nexusglobal.com/increased-plant-availability-and-reduced-pm-activities-by-30?hs_amp=true#downloadform)

 

In the pharmaceutical industry, where the effects of compromised production output can be far-reaching, having [efficient and reliable asset performance](https://www.nexusglobal.com/apmsolutions) is essential. For many pharmaceutical companies, reducing asset downtime has proven to be a worthwhile venture, translating to lower maintenance costs, increased efficiency, and a more productive and engaged workforce.

To help improve asset reliability, a leading pharmaceutical manufacturer engaged Nexus Global to conduct a [PM Optimization (PMO)](https://blog.nexusglobal.com/pm-optimization-6x-faster-than-rcm)Strategy review at one of their facilities. For this particular site, maximizing machine utilization was vital to avoid moving manufacturing to a new facility.

By using PMO methodology and [Strategy Optimizer™,](https://www.nexusglobal.com/strategyopt)Nexus Global was able to successfully develop and implement an optimized PM program in 6 weeks. With the new strategy in place, the site showed a 30% reduction in PM labor/activities with savings in the hundreds of thousands in machine availability. The project proved to be a very valuable initiative for the client with the highest ROI of all projects completed within the company that year.

Download the case study to find out how Nexus Global implemented a [culture of reliability over repair](https://blog.nexusglobal.com/workmgmt/maximizing-maintenance-assessing-non-value-added-activities) to transform a manufacturing site on the brink of shutting down into one of the most reliable and efficient facilities in the pharmaceutical company. 

Download the Case Study

 

 

[View full post](https://blog.nexusglobal.com/increased-plant-availability-and-reduced-pm-activities-by-30)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Doug Robey | CMRP, CRL"
  },
  "dateModified" : "2025-02-11T18:30:46.834Z",
  "datePublished" : "2021-08-23T19:54:01Z",
  "headline" : "Increased Plant Availability and Reduced PM Activities by 30%",
  "image" : {
    "@type" : "ImageObject",
    "height" : 833,
    "url" : "https://f.hubspotusercontent10.net/hubfs/2551661/Case%20Study%20CTAs/GSK%201408x833.png",
    "width" : 1408
  },
  "mainEntityOfPage" : "https://blog.nexusglobal.com/increased-plant-availability-and-reduced-pm-activities-by-30",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://cdn2.hubspot.net/hubfs/2551661/ng-logo-01.svg",
      "width" : 60.000004
    },
    "name" : "Knowledge Center"
  }
}
```